|
|
---|---|
TRL-1 | Basic principles observed and reported |
TRL-2 | Technology concept and/or application and/or methodology formulated |
TRL-3 | Critical function and/or characteristic concept proven through analytical and experimental means |
TRL-4 | Components validated in laboratory environment; methodology validated via table-top exercise |
TRL-5 | Components validated in relevant environment; methodology validated in advanced detailed exercise |
TRL-6 | System/subsystem model or prototype demonstrated in a relevant environment; methodology demonstrated in member utility on pilot basis |
TRL-7 | System prototype demonstrated in an operational environment; methodology demonstrated in member utility on initial operational basis |
TRL-8 | Actual system completed and qualified through test and demonstration; methodology demonstrated in member utility on full operational basis |
TRL-9 | Actual system proven through successful operations; methodology widely adopted throughout industry |